All kinds of failures can be encountered in long-term use of industrial chillers. For industrial chillers, if there is a water cut problem, it is very dangerous and must be dealt with in a timely and effective manner. If the optimal processing time is delayed, it will cause serious failure of the industrial chiller, and even cause the equipment to fail to operate normally. Industrial water chillers have different causes of water interruption. Therefore, when dealing with faults, the first step is to analyze the specific cause of the water interruption.

When the industrial chiller is used daily, the heat dissipation of the industrial chiller depends on the water source to take away the hot air. If there is no water flow suddenly when running at high speed, then a large amount of heat cannot be volatilized in time, resulting in a very rapid temperature rise. fast. When the temperature reaches the critical point of high temperature, industrial chillers protect themselves by shutting down. Therefore, as long as the water failure occurs, the industrial chiller will usually stop running after running for about 15 minutes to achieve the purpose of protecting the core components of the industrial chiller.

  How to deal with the failure of water cut?

   1. Distinguish the specific reasons for water cut

  Industrial chillers have different causes of water interruption, so when dealing with the fault, the first step is to analyze the specific cause of the water interruption. If there is a problem with the water source, it is only necessary to restore the water supply in time to restore the operation of the industrial chiller. If it is a water pump fault, it is necessary to carry out comprehensive maintenance and maintenance of the equipment at this time, to eliminate the water pump fault in time, and conduct a comprehensive test at the same time. Ensure that the water pump resumes normal operation before the industrial chiller can be turned on normally.

  2, immediately shut down for maintenance until the water flow returns to normal

   When the industrial chiller is being repaired, it must be shut down for operation. Since the industrial chiller in operation generates more heat, it will also shut down after running for about ten minutes. Therefore, the maintenance and inspection in the state of shutdown can avoid the generation of extra high temperature, mainly to ensure that the industrial chiller is within the normal operating temperature range, which can ensure that the industrial chiller is in a normal operating state.

   There is no need to be overly alarmed when encountering various industrial chiller failures. Using professional equipment to conduct careful analysis of industrial chillers can find the root cause of the failure. Then, according to their specific capabilities, develop a suitable maintenance plan to ensure the re-operation of the industrial chiller in the shortest time.

Recent related posts

Customers frequently viewed

New In stock for sale, IWAYA DENKI Water Pump 25CJT0752

IWAYA DENKI Water Pump 25CJT0752

US$2307.69
New In stock for sale, ROTEN Mechanical Seal 8E5K-22-X

ROTEN Mechanical Seal 8E5K-22-X

US$384.62
New In stock for sale, HAWKER Battery 7PzS420

HAWKER Battery 7PzS420

US$4230.77
New In stock for sale, SHAKO Air Cylinder JC50B130

SHAKO Air Cylinder JC50B130

US$121.15
New In stock for sale, Ding Zing Oil Seal HUN 80*90*6

Ding Zing Oil Seal HUN 80*90*6

US$2.69
New In stock for sale, KCL Vane Pump 50T-14-LRR-G-PA-01

KCL Vane Pump 50T-14-LRR-G-PA-01

US$498.08
New In stock for sale, Banner Sensor SM312FPH

Banner Sensor SM312FPH

US$320.45
New In stock for sale, Suntronix Fan SJ7025

Suntronix Fan SJ7025

US$6.15