Installation method of ventilation and air conditioning system

Installation method of ventilation and air conditioning system

1.Installation of ventilation ducts

1) The duct can be manufactured on site or prefabricated in the factory. The duct manufacturing methods are divided into bite connection, rivet connection, and welding.

  A. Bite connection. This connection is suitable for ordinary thin steel plates and galvanized thin steel plates with a thickness not greater than 1.2mm, stainless steel plates with a thickness not greater than 1.0mm, and aluminum plates with a thickness not greater than 1.5mm.

  B. Rivet connection.

  C. Welding. When the ventilation and air-conditioning ducts have high sealing requirements or thick plates cannot be connected by biting, the connection of plates is often welded. Commonly used welding methods are electric welding, gas welding, tin welding and argon arc welding.

  The duct with a larger pipe diameter needs to be reinforced in order to ensure that the section is not deformed and reduce the noise generated by the vibration of the pipe wall.

   When the pipe diameter is greater than 700mm, and the pipe section is longer, flat steel flat reinforcement can be used every 1.2m. Reinforcement measures should be taken for rectangular ducts when the side length is greater than or equal to 630mm and the pipe section is greater than 1.2m. The air duct with side length less than or equal to 800mm should be reinforced by ribs and ridge lines. When the length of the middle and high-pressure air pipes is greater than 1.2m, they should be reinforced in the form of reinforcement frames. The single bit seam of the high-pressure air pipe should be reinforced and reinforced.

  2, installation of air duct components

   Before installing the air valve, check whether the frame structure is firm and whether the adjusting device is flexible.

   3. Ventilation equipment installation

  4. Trial operation and debugging of ventilation (air conditioning) system

  Ventilation (air conditioning) system test operation and commissioning can generally be divided into five stages: preparation work, equipment single test operation, joint test operation without production load, completion acceptance, and comprehensive efficiency test.

  Comprehensive effectiveness test includes comprehensive effectiveness test of ventilation and dust removal system, and comprehensive effectiveness test of air-conditioning system.

Recent related posts

Customers frequently viewed

New In stock for sale, IWAYA DENKI Water Pump 25CJT0752

IWAYA DENKI Water Pump 25CJT0752

US$2307.69
New In stock for sale, ROTEN Mechanical Seal 8E5K-22-X

ROTEN Mechanical Seal 8E5K-22-X

US$384.62
New In stock for sale, BANLMEYD BMD Bearing 23038CC/W33

BANLMEYD BMD Bearing 23038CC/W33

US$88.46
New In stock for sale, Keyence Sensor PZ-G42CB

Keyence Sensor PZ-G42CB

US$1625.00
New In stock for sale, OKTY Oil Seal TC(NBR)24*50*8

OKTY Oil Seal TC(NBR)24*50*8

US$0.77
New In stock for sale, Weintek HMI CMT-G01

Weintek HMI CMT-G01

Contact Us
New In stock for sale, SIEMENS Module 6SY8101-0AA32

SIEMENS Module 6SY8101-0AA32

US$3433.08
New In stock for sale, Honeywell Actuator MBS7L3B4/U

Honeywell Actuator MBS7L3B4/U

Contact Us