York YK centrifugal water chiller overhaul; unit vibration failure

York YK centrifugal water chiller overhaul; unit vibration failure York YK centrifugal water chiller overhaul, unit vibration failure: Reason: Remedy: • Coupling is out of center • Realignment • Bearing wear • Overhaul and replace the bearing • Increased gear wear • Overhaul and replace gear • Surge • Adjustment operation • Pipe hydraulic impact • Adjust the flow of waterway • Defective anti-vibration pad • Replace anti-vibration pad The unique structure design of York YK centrifuge has excellent part load adjustment performance. The unit can make full use of the cooling water temperature as low as 12.8 ℃, and the energy consumption of part load is much lower than that of other brand units. The centrifugal units of other brands are limited by the oil return system and drive structure of the unit. The cooling water inlet temperature needs to be artificially controlled to 21 to 24 ℃, which wastes energy in vain and has low load regulation performance. York YK centrifugal chiller overhaul, unit vibration failure

Recent related posts

Customers frequently viewed